Steel Fabrication Drawings provided for Mellon House, Brentwood.
Detailed on Tekla Structures in 3D for creating drawings and reports for fabrication.
The project involves converting an existing building into flats, which includes strengthening works and adding additional floors above the roof. The scope also covers the construction of a staircase and its enclosure. One of the main challenges was integrating cold rolled steel to support the floor, which had to fit precisely between bracing and other structural members.
280 tonnes of hot rolled steel and 33 tonnes of cold rolled steel, secured with nearly 39,000 bolts.