Bolsover Street Phases 1 & 2

 

Each phase was a penthouse comprising of a steel frame with steel to steel and steel to concrete connections. Phase 2 included some strengthening steelwork which was made up of 5 welded up trusses sitting above a listed building.

Phases 1 & 2 totalled 131 tonnes of steelwork.